Rigging, Dismantling, Removal and Plant Relocation of Equipment for a Major Pharmaceutical Plant – Dayton, NJ
Dayton, NJ – Heritage Industrial Services, Inc. recently completed the turn-key relocation and re-installation of a 100,000 sqft. pharmaceutical plant. The time-sensitive project was performed over a period of 6 weeks, working 12 hour shifts Monday thru Saturday from start to completion.
There were over 40 trailer loads of manufacturing equipment, vessels, robotic filling lines, shredders, lab equipment, pallet racking and other associated office infrastructure items removed and re-installed at the new location.
Heritage performed all utility disconnects and reconnects, final setting and recommissioning of the machinery and equipment.
The project was completed safely, on-time and to the client’s satisfaction.