
teflon coating tower
The Heritage Team recently completed a turnkey rigging and dismantling project involving a Teflon Coating Tower and its associated auxiliary equipment. This complex project required a high level of expertise and meticulous planning to ensure the safe and efficient removal of the equipment.
Before any work commenced, we developed a detailed site-specific safety plan. This plan addressed all potential hazards associated with the project, including fall protection and heavy equipment operation.
Location:
NJ
Industry:
Manufacturing

THE CHALLENGE
The project scope included:
- Performing all necessary electrical disconnects, ensuring the safety of personnel and equipment throughout the process
- Dismantling the Teflon Coating Tower and its auxiliary components using specialized rigging techniques and equipment
- Relocating the equipment to its new destination, coordinating all aspects of transportation, and ensuring the equipment arrived at the new site safely and undamaged
- Reinstalling the Teflon Coating Tower with accurate alignment and complete reconnection of all systems
THE EXECUTION
This project demonstrates Heritage’s ability to execute complex industrial projects precisely and safely.
The team’s expertise in rigging, dismantling, and reinstallation, combined with their commitment to safety protocols, ensured the successful completion of this challenging undertaking.
